|
|
![]() |
|
![]() |
|||||||
references
|
powder painting system PRODUCTION: work for account third - banisters-pieces and cabins for crane etc.. SYSTEM: Powder painting system TRANSPORT SYSTEM: with chain to mono rail SPEED: 2,5 mt./min - variable PRODUCTION: variable CARRYING POLE SIZE: 6000x1800xh2300 mm CARRYING POLE WEIGHT: 600 kg. PRETREATMENT SYSTEM: yes DRYING OVEN: yes - Work temperature 110° C - well chamber POLYMERIZATION OVEN: yes, Work temperature 180° C, 20 minutes. - well chamber WORKING: automatic with control in supervision |
|
||
![]() |
|||
|
|
||||