HOME PAGE

ITALIAN       ENGLISH

 
COMPANY
About the company
Where we are
Contact us
References
 
SYSTEMS FOR SURFACE TREATMENT
SYSTEMS FOR ENERGY RECOVERY FROM WASTE
INCINERATION SYSTEMS
AUTOMATION SYSTEMS

references

 

Organic waste


BASE SPECIFICATIONS OF THE SYSTEM

PRODUCTION OF THE FIRM: Engineering

PLACE OF THE INSTALLATION: Madejra (Portugal)


TYPE OF THE WASTE: Organic waste
QUANTITY: 5 ton/day
CALORIFIC POWER: 1.500 kcal/kg


WORK TIME: HOURS- 10/day
DAYS- 4/week
WEEK- 52/year


INCINERATION POTENTIALITY: 0,5 ton/h

TYPE OF THE LOADING: Half-automatic

TYPE OF THE COMBUSTION CHAMBER: Tilting
WORK TEMPERATURE: 850 C

AFTER-BURNER CHAMBER: Yes
WORK TEMPERATURE: 950 C
GAS RESIDENCE TIME: 2 s

HEAT RECOVERY: No

TREATMENT OF THE GAS: Thermic


WORK CONTROL: Automatic with P.L.C.


AUXILIARY COMBUSTIBILE: gas-oil
FUEL CONSUMPTION: 80 kg/h

 

 

 

   
<< back
ITALIAN       ENGLISH

       
home