Organic waste
BASE SPECIFICATIONS OF THE SYSTEM
PRODUCTION OF THE FIRM: Engineering
PLACE OF THE INSTALLATION: Madejra (Portugal)
TYPE OF THE WASTE: Organic waste
QUANTITY: 5 ton/day
CALORIFIC POWER: 1.500 kcal/kg
WORK TIME: HOURS- 10/day
DAYS- 4/week
WEEK- 52/year
INCINERATION POTENTIALITY: 0,5 ton/h
TYPE OF THE LOADING: Half-automatic
TYPE OF THE COMBUSTION CHAMBER: Tilting
WORK TEMPERATURE: 850 C
AFTER-BURNER CHAMBER: Yes
WORK TEMPERATURE: 950 C
GAS RESIDENCE TIME: 2 s
HEAT RECOVERY: No
TREATMENT OF THE GAS: Thermic
WORK CONTROL: Automatic with P.L.C.
AUXILIARY COMBUSTIBILE: gas-oil
FUEL CONSUMPTION: 80 kg/h
|